USACE, SEATTLE DISTRICT

Corps of Engineers Reimagines Barracks Construction with Mass Timber Material

At A Glance: Mass Timber Barracks Pilot Project/Program: Mass Timber Barracks Construction Pilot Location: Joint Base Lewis-McChord (JBLM), WA Cost/Status: Groundbreaking (Dec. 12, 2025) / Completion Early 2028 Key Outcome: 105,000 sq. ft. sustainable housing for 200 soldiers SEATTLE — […]

Corps of Engineers Reimagines Barracks Construction with Mass Timber Material Read More »

Innovating for the Future: USACE Uses Sustainable Building Materials for JBLM Barracks, Enhances Army’s Climate Resiliency Goals

Editor’s note: Robert Moser, Ph.D., was selected as ERDC’s Director of Information Technology Lab prior to this story’s publish date. Out with the old, in with the new. The U.S. Army Corps of Engineers, Joint Base Lewis-McChord (JBLM), U.S. Army

Innovating for the Future: USACE Uses Sustainable Building Materials for JBLM Barracks, Enhances Army’s Climate Resiliency Goals Read More »