Military Mission

Looking through a construction framework at a foundation site filled with rows of metal reinforcement rebar columns and scaffolding under a clear blue sky, with a yellow tower crane standing in the background.

USACE FED Completes Construction of New $130 Million Camp Humphreys Barracks Project

At A Glance Capital Outlay: Completion of a $130 million Unaccompanied Enlisted Personnel Housing (UEPH) infrastructure asset array. Structural Scope: Features three 8-story towers holding 300+ soldiers each; integrating an additional four concurrent towers this fall to house 2,100+ personnel. […]

USACE FED Completes Construction of New $130 Million Camp Humphreys Barracks Project Read More »

ERDC LOGO

ERDC Deploys Sub-Surface Robotics and Hydrodynamic Modeling to Morocco Search Operations

At A Glance Mission Parameters: Multi-national search and recovery mobilization spanning 21,000 square kilometers across the Atlantic littoral zones near Cape Draa, Morocco. Sub-Surface Robotics: Deployed a specialized Remotely Operated Vehicle (ROV) equipped with high-resolution sonar, laser scanning, and real-time

ERDC Deploys Sub-Surface Robotics and Hydrodynamic Modeling to Morocco Search Operations Read More »

A soldier with camouflage face paint and a foliage-covered helmet looks down at a rugged handheld mobile device while leaning against a tree trunk in a dense forest.

How the Tactical Assault Kit (TAK) Bridges Battlefield and Disaster Interoperability

At A Glance Ecosystem Scope: The Tactical Assault Kit (TAK) serves as a global geospatial mapping and communication framework bridging tactical units and civilian agencies. Operational Leadership: Directed by the ERDC Geospatial Research Laboratory (GRL), consolidating core public mapping engineering

How the Tactical Assault Kit (TAK) Bridges Battlefield and Disaster Interoperability Read More »

A large industrial dredging vessel named DB CATALINA floats on choppy water under an overcast sky, equipped with heavy cranes, rigging towers, and red-and-white striped safety markers.

USACE Clears Critical Navigation Channels at MOTSU

At A Glance Project Investment: $6.3 Million federal navigation contract Sediment Footprint: 500,000 to 600,000 cubic yards extracted Primary Asset: DB Catalina (Western Hemisphere’s largest mechanical dredge) Eco Threshold: 90% emissions reduction; minimized sturgeon habitat risks Tactical Benefit: Pipeline-free configuration

USACE Clears Critical Navigation Channels at MOTSU Read More »

Architectural rendering of a modern airfield complex featuring a tall, concrete air traffic control tower, an air operations facility, and a fire station with large glass bay doors under a bright blue sky.

Building the Spaceport of the Future: USACE and Space Force Modernize Vandenberg Infrastructure

At A Glance: Spaceport Modernization The Mission: A joint USACE and U.S. Space Force engineering initiative to completely replace aging 1953 airfield control infrastructure at Vandenberg Space Force Base. Design Acceleration: Authorization was officially granted to advance the architecture-engineering (AE)

Building the Spaceport of the Future: USACE and Space Force Modernize Vandenberg Infrastructure Read More »