Projects

Missouri River Navigation Structure Repairs Continue with Cora Island Flow Control Structures After Severe Damage from 2019 Flood

At A Glance: Cora Island Repairs Project: Missouri River Navigation Repair (Cora Island) Location: Lower Missouri River Basin, Missouri Cause: Severe damage from the “Great Flood of 2019” Key Effort: Placing ~120,000 tons of riprap Outcome: Restored navigation channel &

Missouri River Navigation Structure Repairs Continue with Cora Island Flow Control Structures After Severe Damage from 2019 Flood Read More »

Louisville District Modernizes Historic ‘Brick Quarters’ at Wright-Patterson AFB

At A Glance: WPAFB Historic Renovation Project: “Brick Quarters” Historic District Modernization Location: Wright-Patterson Air Force Base, Ohio Cost: $70.7 Million Scope: 29 Tudor Revival homes (Built 1930s) Completion: Phase 1 (May 2025) – Final Phase (2027) Key Challenge: Retrofitting

Louisville District Modernizes Historic ‘Brick Quarters’ at Wright-Patterson AFB Read More »

The original building, nicknamed the "white elephant," is shown in the upper right. It is now part of a larger group, each of which is a necessary part of the remediation process. From removal from the trenches to exiting from the site, the highly trained workers involved in the remediation process all have specialized qualifications to ensure the safety of workers and the community. USACE PHOTO BY JEFFERY HARRIS

From White Elephant to City: USACE Makes Strides Towards Physical Remediation of the Shallow Land Disposal Area in Parks Township, PA

At A Glance: SLDA Remediation Project: Shallow Land Disposal Area (SLDA) Cleanup Location: Parks Township, PA (near Vandergrift & Leechburg) Authority: FUSRAP (Formerly Utilized Sites Remedial Action Program) Timeline: Physical Remediation starts Winter 2025-2026 Duration/Cost: ~6 Years / ~$500 Million

From White Elephant to City: USACE Makes Strides Towards Physical Remediation of the Shallow Land Disposal Area in Parks Township, PA Read More »