August 21, 2026

$18.5M Miller-Rice Pile Dike System Repairs Contract Awarded to Big River Construction, USACE – August 21, 2026

Stabilizing commercial navigation channels, controlling river flow velocities, and preventing bank erosion along the Lower Columbia River, Big River Construction Inc. has been awarded an $18,499,000 firm-fixed-price contract. The civil works award finances comprehensive structural repairs to the Miller-Rice Pile Dike System in Cathlamet, Washington.

Contract Details: At A Glance

Contractor:Big River Construction Inc.
Award Date:August 21, 2026
Contract Value:$18,499,000
Project:Miller-Rice Pile Dike System Repairs
Location:Cathlamet, Washington (Lower Columbia River)
Contract Number:W9127N-26-C-A031
Awarding District:U.S. Army Corps of Engineers, Portland District

District Context & Mission Impact

This essential river training structure repair project is administered by the U.S. Army Corps of Engineers Portland District. The Portland District manages multi-purpose dams, ecosystem restoration, and deep-draft navigation maintenance along the Columbia and Willamette rivers. The Columbia River Federal Navigation Channel supports billions of dollars in commercial trade annually, serving as a primary Pacific Northwest export corridor for grain, timber, and manufactured goods. Pile dikes are permeable timber and rock training structures extending into the river current that direct water flow into the main navigation channel. Redirecting flow momentum naturally scours bed sediment, reduces maintenance dredging requirements, and protects riverbanks against severe erosion. Restoring the damaged Miller-Rice pile dike system ensures structural integrity, preserves navigation channel depth, and maintains safe commercial vessel passage through 2029.


Contractor Spotlight & Industry Context

Based in Astoria, Oregon, Big River Construction Inc. is an experienced Pacific Northwest heavy civil and marine contractor specializing in pile driving, river training structures, bridge construction, and coastal infrastructure. Bids were solicited via the internet with four competitive proposals received. Repairing pile dike structures within the heavy current and tidally influenced waters of the Lower Columbia River requires specialized barge-mounted crane equipment, timber pile driving, enrockment placement, and strict compliance with seasonal fish protection windows. Public-private partnerships in river structure maintenance remain fundamental to keeping Pacific Northwest maritime trade routes open and self-sustaining.

Don't miss a story! Get your free America's Engineers newsletter!
Digital Edition Sponsor
Get the free newsletter
Your subscription could not be saved. Please try again.
Almost there! Check your inbox for a confirmation link from America's Engineers to finish signing up.
Stay Connected