At A Glance

  • Interagency Disaster Recovery: USACE Nashville District is managing a $34.5 million debris-removal operation across 80+ acres of public land on Jackson Island in Cherokee National Forest under an Economy Act agreement with the USDA Forest Service.
  • Critical Human Remains Recovery: Early in operations, combined field crews successfully located and respectfully recovered the remains of flood victim Nancy Tucker, who went missing during Hurricane Helene.
  • Environmental & Archaeological Preservation: Heavy equipment traverses 1,400 timber access mats to prevent ground compaction, while on-site bioarchaeologists monitor daily work to safeguard buried cultural resources.
  • Debris Quantities & Recycling: Over 80,000 cubic yards of vegetative debris cleared to date, ground at a 3:1 ratio for agricultural reuse, alongside processing 130,000 pounds of hazardous materials and white goods.
  • Operations Leadership: Led by USACE District Commander Lt. Col. Guillermo Guandique, Project Manager Nathaniel Brock, DRC Emergency Services, and Washington County-Johnson City EMS.

Editor’s Note: The following is from USACE Nashville District, curated by America’s Engineers for general public, commercial contractor, and industry visibility. The original article can be found at the U.S. Army Corps of Engineers news repository.

U.S. Army Corps of Engineers disaster recovery crews have begun removing thousands of tons of Hurricane Helene debris from Jackson Island along the Nolichucky River. Primary contractor DRC Emergency Services LLC is leading the massive cleanup operation along the riverbanks.

During an Oct. 16 site visit, USACE Nashville District leaders met with contractors on Jackson Island to inspect debris cleanup operations. The district is managing the $34.5 million debris-removal mission under an Economy Act interagency agreement with the U.S. Department of Agriculture Forest Service.

“I am incredibly proud of the team,” said Lt. Col. Guillermo Guandique, U.S. Army Corps of Engineers Nashville District commander. “This looks like an easy operation only because the contractors put in so much work ahead of time in preparation for this and making sure that they are executing this professionally and efficiently, and most importantly, safely.”

A yellow tracked excavator feeds timber into an industrial horizontal grinder discharging mulch into an adjacent semi-trailer.
A tracked excavator feeds storm-damaged timber into an industrial horizontal grinder at the Jackson Island debris management site. The machinery reduces vegetative wreckage at a three-to-one ratio, creating mulch that is repurposed for beneficial use on local farmlands. Over 80,000 cubic yards of vegetative debris have been processed through this site. (USACE photo by Nashville District)

Field teams began clearing debris Sept. 9. Early in the operation, the combined team achieved a monumental breakthrough for eastern Tennessee by locating and respectfully recovering the remains of Nancy Tucker, who disappeared in catastrophic floodwaters from Hurricane Helene two years ago.

Maj. Bonny J. Bradway shakes hands with contractor John R. Sullivan in a staging area near parked utility terrain vehicles.
Maj. Bonny J. Bradway, deputy commander of the U.S. Army Corps of Engineers Nashville District, shakes hands with John R. Sullivan, president of DRC Emergency Services, at the Jackson Island staging yard near Johnson City, Tennessee, Oct. 16, 2026. District leadership met with contractor teams before touring operations on the $34.5 million Hurricane Helene debris-removal mission in the Cherokee National Forest. (U.S. Army Corps of Engineers photo by Noe Gonzalez)

To recognize that teamwork, Guandique presented certificates of appreciation to Dylan Davis and Tim Johnson of Mid-Atlantic Tree Service LLC, Matthew Bean of Civil & Environmental Consultants, Inc., Branden Chambers of Washington County, and Johnson City EMS for their careful coordination and site safety during the recovery.

A wooden memorial cross now stands near a quiet grove of trees on the island in Tucker’s honor, marking where recovery teams located her. Addressing the assembled crew, Chambers delivered a message of gratitude directly from her family and neighbors.

Branden Chambers in a high-visibility vest and emergency helmet speaks to military leaders and contractors standing on site.
Branden Chambers of Washington County-Johnson City Emergency Medical Services addresses USACE leaders and cleanup crews on Jackson Island. Chambers shared expressions of gratitude from the community and family members following the recovery of flood victim Nancy Tucker. Interagency teams maintain careful coordination to conduct operations safely across the sensitive 80-acre site. (USACE photo by Nashville District)

“They asked me to do one thing today that was the most important to them… to make sure that everybody understood how appreciative the community is to everyone here in this group and what you all did to bring Miss Tucker home,” said Branden Chambers of Washington County-Johnson City Emergency Medical Services, adding that DRC and Mid-Atlantic have consistently gone above and beyond to support the community.

Damaged appliances and scrap metal stacked on black containment sheeting in a fenced field.
Damaged appliances and metal debris sit on containment liners at a sorting staging area on Jackson Island along the Nolichucky River. Crews isolate white goods and drain refrigerants to prevent environmental contamination before routing metal to commercial recyclers. The operation is part of the USACE Nashville District’s interagency disaster recovery mission following Hurricane Helene. (USACE photo by Nashville District)

Even with the recovery of Nancy Tucker complete, equipment operators and federal partners continue working with heightened caution across more than 80 acres of public land in the Cherokee National Forest.

Lt. Col. Guillermo Guandique stands on a timber haul road in uniform, safety vest, and hard hat overlooking the cleanup site.
Lt. Col. Guillermo Guandique, commander of the USACE Nashville District, observes debris clearing operations along the Nolichucky River. The district is managing the $34.5 million mission under an Economy Act agreement with the USDA Forest Service. Leadership visits ensure safety benchmarks, archaeological preservation protocols, and environmental standards are rigorously maintained. (USACE photo by Nashville District)

Field personnel follow strict federal workplace safety standards, conducting daily equipment checks and safety briefings before each shift. To protect the terrain, workers lay roughly 1,400 heavy wooden mats along equipment paths. These thick timber mats spread the weight of heavy excavators like snowshoes, preventing soil compaction and shielding buried archaeological deposits beneath layers of river sand and mud. They avoid aggressive digging, maintaining slow, deliberate clearing speeds to protect the sensitive grounds.

A contractor in a high-visibility vest gestures while speaking to Lt. Col. Guillermo Guandique on a timber mat path.
Contractors brief Lt. Col. Guillermo Guandique on daily debris volume hauling and site conditions during a progress inspection on Jackson Island. Field teams maintain a steady pace of approximately 50 truckloads per day along an 11-mile transport route. Strong communication between federal overseers and primary contractors keeps the complex mission ahead of schedule. (USACE photo by Nashville District)

“We’re ahead of schedule as far as our debris removal,” said Mark Cardwell, operations manager for DRC Emergency Services. “The big part of this multi-layered mission is that we had the human remains element that was very important to DRC, and the local community. We were fortunate to get that taken care of early on in the process. Once that we’ve got that done, it’s been normal operations, with the exception of the project’s original scope to where we’re at now, we know that’s going to grow, and there’s even more work to do here than what we initially thought, but we’re looking forward to seeing it through to the end and getting the job done.”

A yellow tracked excavator feeds timber into an industrial horizontal grinder discharging mulch into an adjacent semi-trailer.
A tracked excavator feeds storm-damaged timber into an industrial horizontal grinder at the Jackson Island debris management site. The machinery reduces vegetative wreckage at a three-to-one ratio, creating mulch that is repurposed for beneficial use on local farmlands. Over 80,000 cubic yards of vegetative debris have been processed through this site. (USACE photo by Nashville District)

Because Jackson Island holds rich cultural history, on-site archaeologists monitor daily operations while operators watch constantly for historic artifacts.

We’re so glad you are here! Like what you’re reading? Make America’s Engineers a Google preferred news source.

“The whole point is to avoid ground disturbance on this,” said Matthew Bean, bioarcheologist with Civil & Environmental Consultants, Inc. “To have archaeologists on site, not necessarily to do work, but to ensure that if anything does accidentally come up during the cleanup process, we are there to document it and close it off, and they can continue working around that as needed.”

Lt. Col. Guillermo Guandique shakes hands with Matthew Bean while presenting a certificate of appreciation against a mountain backdrop.
U.S. Army Corps of Engineers Nashville District Commander Lt. Col. Guillermo Guandique presents a certificate of appreciation to Matthew Bean, archaeologist for CEC Inc., on Jackson Island near Johnson City, Tennessee, Oct. 16, 2026. Guandique recognized Bean for exceptional vigilance and teamwork during search, recovery, and debris-removal operations following Hurricane Helene. (U.S. Army Corps of Engineers photo by Noe Gonzalez)

Hauling operations maintain steady, careful progress as specialized self-loading trucks transport broken trees and river wreckage across an 11-mile route to the debris management site (DMS).

A red Timberpro forestry machine with a log crane works on a timber-mat road next to a large mound of debris.
A specialized Timberpro crane machine navigates timber decking to lift debris along the Nolichucky River banks on Jackson Island. Timber mats are critical across the 80-acre tract to prevent heavy tracked equipment from disturbing buried archaeological artifacts. Strict daily safety briefings and deliberate speeds guide all heavy mechanical clearing operations. (USACE photo by Nashville District)

“On average, we’re running about six trucks every day,” said Trevor Taylor, project manager for DRC Emergency Services. “Out of those six trucks, they’re doing about 50 loads, total. So, on average, we’re doing anywhere from 2,000 cubic yards to 2,500 cubic yards a day of vegetative debris.”

Lt. Col. Guillermo Guandique shakes hands with Tim Johnson while presenting a framed certificate of appreciation on open ground.
U.S. Army Corps of Engineers Nashville District Commander Lt. Col. Guillermo Guandique presents a certificate of appreciation to Tim Johnson on Jackson Island near Johnson City, Tennessee, Oct. 16, 2026. Guandique recognized Johnson for exceptional vigilance and teamwork during search, recovery, and debris-removal operations following Hurricane Helene. (U.S. Army Corps of Engineers photo by Noe Gonzalez)

At the DMS, industrial horizontal grinders reduce clean tree debris at a three-to-one volume reduction ratio. Transport trucks then take the fresh mulch to an adjacent agricultural property for beneficial soil reuse, returning organic nutrients to local farmland.

A tall pile of shattered wood debris, river drift, and discarded building materials stacked against a blue sky.
Piles of shattered timber, river wreckage, and construction debris await sorting and mechanical grinding on Jackson Island. The multi-layered cleanup mission addresses thousands of tons of flood debris deposited along the Nolichucky River corridor. Field crews sort clean organic wood from treated materials and hazardous components before processing. (USACE photo by Nashville District)

Subcontractor Thompson Consulting Company monitors every incoming and outgoing load through its electronic Automated Debris Management System, utilizing QR code scans to record and verify debris quantities in real time without paper tickets. To date, crews have cleared more than 80,000 cubic yards of storm debris safely from the corridor.

Lt. Col. Guillermo Guandique shakes hands with Dylan Davis of Mid-Atlantic Tree Service while presenting a framed certificate of appreciation.
Lt. Col. Guillermo Guandique presents a certificate of appreciation to Dylan Davis of Mid-Atlantic Tree Service LLC for careful coordination during recovery efforts. The recognition honored contractors and responders who assisted in locating flood victim Nancy Tucker early in the operation. Interagency teams were recognized for prioritizing site safety and meticulous care throughout the process. (USACE photo by Nashville District)

“The debris comes off the island, comes through here, it gets processed, reduced, compacted, and then it goes to its final destination.” said Kevin Parker, debris monitoring manager for Thompson Consulting Services. “Our job is to quantify the debris,” Parker stated. “We have brought in approximately 80,000 cubic yards of vegetation since the project began a little over a month ago, and we’ve processed about 130,000 pounds of hazardous waste. Crews work 12 hours a day from sunup to sundown, seven days a week to get the job done.”

Field crews carefully isolate household hazardous items, construction materials, and white goods from clean wood. DRC personnel have safely gathered and processed roughly 2,000 pounds per day, including propane tanks, chemical barrels, and creosote railroad ties. Crews extract abandoned household appliances, safely drain refrigerants, and deliver scrap metal to commercial recyclers.

Lt. Col. Guillermo Guandique presents a certificate of appreciation to Branden Chambers in front of a graded staging area and distant hills.
Lt. Col. Guillermo Guandique presents a certificate of appreciation to Branden Chambers of Washington County-Johnson City EMS at the Jackson Island recovery site. The presentation recognized local emergency responders for their vital support and coordination with federal cleanup teams. The partnership highlights the close relationship between military engineers, local emergency services, and community members. (USACE photo by Nashville District)

As the multi-layered cleanup moves closer to completion, federal oversight remains a constant presence on the island to ensure long-term environmental restoration.

“We continue to provide oversight on this project with our quality assurance personnel on site and are grateful to be able to help the local community get public lands back to what they need to be,” said Nathaniel Brock, USACE project manager.

This article was originally published by the U.S. Army Corps of Engineers under the title, “Nashville District commander honors team tackling Jackson Island flood cleanup.” Reposted with permission.