THE SUCCESS MEMO PAVES THE WAY FOR IMMEDIATE INSTALLATION AT OVER 800 U.S. FACILITIES.


TechFlow, a 100% employee-owned forward-thinking energy, mobility, logistics, and digital solutions company, today announced it has received a success memorandum from the Defense Innovation Unit (DIU) for its self-sustaining electric vehicle (EV) infrastructure solution. This distinction marks the DIU’s first recognition for an EV charging solution. 

The success memorandum allows all Department of Defense (DoD) Services – including the Army, Marine Corps, Navy, Air Force, Space Force, and Coast Guard – along with Civilian Agencies to enter production agreements with TechFlow, enabling the immediate installation of EV charging infrastructure across more than 800 facilities nationwide. 

TechFlow’s EV charging infrastructure solution represents the pinnacle of adaptability and sustainability in EV charging. Adeptly designed for versatility, TechFlow’s solution accommodates a comprehensive suite of applications, including Charging-as-a-Service (CaaS), Government-owned Government-operated (GOGO), Government-owned Company-operated (GOCO), Company-owned Company-operated (COCO), and multiple tenancy models. Compatible with a wide spectrum of vehicles, TechFlow’s solution supports both Government Owned Vehicles (GOVs) and Personally Owned Vehicles (POVs), providing each access to utilize the same Level 2 and Level 3 fast charging assets, thus reducing infrastructure costs. 

Beyond mere self-sufficiency, TechFlow’s solution seamlessly integrates cutting-edge energy storage systems, microgrid technologies, and a diverse array of energy sources, ensuring the delivery of robust and efficient EV charging services that are responsive to the rapidly evolving energy landscape.  

TechFlow’s year-long collaboration with the Defense Innovation Unit (DIU) has culminated in developing and successfully deploying advanced EV charging infrastructure prototypes at multiple Department of Defense (DoD) sites across the United States, including Air Force, Army, Marine Corps, and Navy bases. The DIU thoroughly evaluated TechFlow’s EV charging infrastructure and associated cloud software, confirming TechFlow’s exceptional service delivery with over 99% uptime.  

“The recognition from the DIU is a testament to TechFlow’s commitment to engineering excellence and versatility in our EV charging solutions,” said TechFlow Vice President of Energy and Mobility Solutions Michael Genseal. “Our approach is customer-centric, ensuring that our infrastructure not only meets the diverse needs of the Department of Defense but also paves the way for adaptable installations across various agencies, enabling reliability and efficiency in their shift to clean energy.” 

“We are immensely proud to be among the first recipients of a success memorandum from DIU’s Energy Portfolio,” said TechFlow President and Chief Operating Officer Mark Carter. “This recognition underscores TechFlow’s pivotal role as a critical partner in delivering innovative solutions for our government customers, and this significant achievement is a testament to our team’s dedication and expertise.” 

About TechFlow  

TechFlow Inc. is a 100% employee-owned company with nearly three decades of success defined by innovation, agility, and proactiveness. As employee-owners, we balance technology and human factors to determine the best outcome for our customers’ missions. The company supports government and commercial sectors as system developers, integrators, and optimizers in mission-critical markets: digital, platform, base management/logistics, and energy and mobility solutions. Headquartered in San Diego, CA, with offices throughout the United States, TechFlow delivers leading-edge solutions for customers in mission-critical markets. TechFlow. Always Ahead. For more, visit https://techflow.com.  

As part of the Strategic Capabilities Office (SCO) initiative Project Pele, the Department of Defense (DOD) has awarded a contract option to X-energy, LLC of Rockville, Maryland in order to develop an enhanced engineering design for a transportable micro nuclear reactor.

In 2022, SCO selected BWX Technologies, Inc. of Lynchburg, Virginia to build a prototype micro reactor. This work is underway and long lead hardware fabrication has begun. By executing this contract option with X-energy, SCO seeks to develop a complementary micro reactor design that builds upon X-energy's developments completed under Project Pele in 2022. This option continues funding for X-energy to develop its design to meet the technical requirements of Project Pele, targeting a reactor design which is ready for licensing by the Nuclear Regulatory Commission (NRC) for both commercial ventures and military resiliency.

"Due to their extraordinary energy density, nuclear reactors have the potential to serve multiple critical functions for meeting resiliency needs in contested logistical environments," said Dr. Jeff Waksman, Project Pele program manager. "By developing two unique designs, we will provide the Services with a broad range of options as they consider potential uses of nuclear power for both Installation and Operational energy applications in the near future."

The DOD uses approximately 30 Terawatt-hours of electricity per year and more than 10 million gallons of fuel per day—levels that are only expected to increase due to anticipated electrification of the vehicle fleet and maturation of future energy-intensive capabilities. A safe, small, transportable nuclear reactor would address this growing demand with a resilient, carbon-free energy source that does not add to the DOD's fuel needs, while supporting mission-critical operations in remote and austere environments.

This contract option for one year of work by X-energy will not result in a completed engineering design, but will allow a thorough analysis of design options, leading to a Preliminary Engineering Design and initiation of a regulatory preapplication process.

"The Strategic Capabilities Office specializes in adapting commercial technology for military purposes," said Jay Dryer, SCO director. "By nurturing and developing multiple micro reactor designs, SCO will not just provide options for the military Services, but will also help jumpstart a truly competitive commercial marketplace for micro reactors."

More than 150 people attended the U.S. Army Engineering and Support Center, Huntsville (Huntsville Center) Energy Workshop Aug. 1-3 at the Jackson Center located in Huntsville’s Cummins Research Park.

The focus of the workshop was Huntsville Center’s capabilities in the Energy Savings Performance Contracting (ESPC) and Utility Energy Services Contracting (UESC) programs.

This year's theme as "Innovation and New Technology Integration."

Jon Winkler, Huntsville Center Energy Division chief, said Huntsville Center holds this annual workshop for customers and stakeholders, utility providers and all Energy Service Companies (ESCOs) holding contracts on the Center’s $1.5 billion Multiple Award Task Order Contract (MATOC).

Albert "Chip" Marin III, Huntsville Center programs and business director, gives opening remarks to kick off the Center's Energy Workshop Aug. 1 at the Jackson Center. The three-day workshop highlighted Huntsville Center’s capabilities in the Energy Savings Performance Contracting (ESPC) and Utility Energy Services Contracting (UESC) programs. (USACE photo by William Farrow)
Albert "Chip" Marin III, Huntsville Center programs and business director, gives opening remarks to kick off the Center's Energy Workshop Aug. 1 at the Jackson Center. The three-day workshop highlighted Huntsville Center’s capabilities in the Energy Savings Performance Contracting (ESPC) and Utility Energy Services Contracting (UESC) programs. (USACE photo by William Farrow)

“Huntsville Center considers events like these essential for ‘cross-leveling’ fundamental knowledge of industry trends and innovations to make what we all do better,” Winkler said.

Huntsville Center’s customers include Army, Navy and Air Force garrisons, Army Material Command (AMC), Installation Management Command (IMCOM), Deputy Chief of Staff of Army (DCS-G9), Deputy Assistant Secretary of the Army for Energy and Sustainment (DASA-ES), Assistant Secretary of the Army for Installations, Energy and Environment (ASA-IEE), Air Force Civil Engineer Center (AFCEC), Washington Headquarters Services (WHS), and Headquarters US Army Corps of Engineers (HQUSACE).

Patty Mooneyham, UESC Program Manager, said Huntsville Center is considered the Army's expert in third-party financing and utility negotiation energy due to its unique ability to provide support world-wide.

“Unlike other U.S. Army Corps of Engineers Divisions and Districts, Huntsville Center has no geographic boundaries allowing the Center to develop, award, and maintain long-term energy projects worldwide,” Mooneyham said.

Guest speakers for the event were Rep. Gary Palmer, Alabama 6th District and member of the House of Representatives’ Subcommittee on Energy, Grid Security, and Climate Change, and Brendan Owens, Assistant Secretary of the Department of Defense, Energy, Environment, and Infrastructure.

Other speakers include Christine Ploschke, Acting Deputy Assistant Secretary of the Army for Energy and Sustainability; Susan Call, Department of Defense Installation Clean Energy & Energy Efficiency; William Kidd, Army Installation Management Command G4 Facilities and Logistics director and Drew White, U.S. Army Corps of Engineers Installation Readiness Division chief.

The U.S. Army Engineering and Support Center, Huntsville (Huntsville Center) is hosting an Energy Workshop Aug. 1-3 at the Jackson Center located in Huntsville’s Cummins Research Park.

The focus of the workshop is on Huntsville Center’s capabilities in the Energy Savings Performance Contracting (ESPC) and Utility Energy Services Contracting (UESC) programs. This year's theme as "Innovation and New Technology Integration."

As the Army's exclusive agency for third party financed acquisitions, Huntsville Center holds this annual workshop for customers and stakeholders, utility providers and all Energy Service Companies (ESCOs) holding contracts on the Center’s $1.5 billion Multiple Award Task Order Contract (MATOC). 

Unlike other U.S. Army Corps of Engineers Divisions and Districts, Huntsville Center has no geographic boundaries allowing the Center to develop, award, and maintain long-term energy projects worldwide. The Center’s Energy Division currently has a $2 billion ESPC portfolio and a $1 billion UESC portfolio.

Huntsville Center’s customers include Army, Navy and Air Force garrisons, Army Material Command (AMC), Installation Management Command (IMCOM), Deputy Chief of Staff of Army (DCS-G9), Deputy Assistant Secretary of the Army for Energy and Sustainment (DASA-ES), Assistant Secretary of the Army for Installations, Energy and Environment (ASA-IEE), Air Force Civil Engineer Center (AFCEC), Washington Headquarters Services (WHS), and Headquarters US Army Corps of Engineers (HQUSACE).  

Congressman Gary Palmer, Alabama 6th District, and Brendan Owens, Assistant Secretary of Defense for Energy, Installations, and Environment, are scheduled as the event keynote speakers.

To register for the event, visit www.2023espcworkshop.com

For more information on Huntsville Center’s Energy Division, visit www.hnc.usace.army.mil

The U.S. Army Corps of Engineers, Engineering and Support Center Huntsville awarded the U.S. Army Office of Energy Initiatives Energy Support Services Generation Five (OEI V) requirement for $28,805,119 to incumbent Booz Allen Hamilton, Inc., on June 12.

The task order was procured using the General Services Administration’s (GSA) One Acquisition Solution for Integrated Services (OASIS), multiple award (MA), Indefinite Delivery Indefinite Quantity (IDIQ) contract.

After exercising all options and having a justification and approval granted by the Senior Contracting Official, Alexandria (SCO-ALX) to further extend the period of performance, the current task order is set to expire on June 27, 2023. Huntsville Center successfully awarded the OEI V task order ahead of the current task order expiration date, preventing a gap in service and the need for a bridge contract.

The OEI V GSA OASIS task order will provide the subject matter experts and resources needed to assist military installations in developing third-party financed projects addressing resilience and security gaps. The efforts of this contract will also help develop a common understanding and standard metrics across military installations. This task order will allow for continued performance on the mission of identifying energy resilience and security projects, which must continue due to the mandate for U.S. Army installations to be capable of withstanding an extended utility outage for a duration set by the senior commander or at a minimum 14 days.

The period of performance for this fifth generation contract is 36 months.

Two important Army installations are using a tool provided by the U.S. Army Engineering and Support Center, Huntsville to support the Army’s Installation Energy and Water Resilience Policy.

The tool is the Energy Savings and Performance Contracts (ESPC) program administered by Huntsville Center. ESPCs utilize private capital to make infrastructure improvements and new efficiencies without tapping into the capital budget to support and enable the warfighter and meet energy and environmental mandates.

U.S. Army engineers with 601st Engineer Detachment, pour concrete.
From left, Spc. John Tilicki, Pvt. Dakota Courtney, Spc. Jeremy Kane and Sgt. Paul Reap, all engineers with 601st Engineer Detachment, pour concrete into the base of what will be one of 28 light poles at the Central Receiving Shipping Point at Fort McCoy, Wis., June 23, 2022. (U.S. Army Reserve photo by Zach Mott, 88th Readiness Division)

Considered the Army’s expert in ESPCs, Huntsville Center implemented the contracts to assist the installations in supporting the Army Climate Strategy by providing energy resilience and energy cybersecurity and reducing energy and water use (as well as carbon and greenhouse gas emissions) to improve readiness and save taxpayers money. 

At Army Garrison Carlisle Barracks, Penn., the ESPC project there is in its fifth year of the performance period and has exceeded the guaranteed savings by $62,973. The home to the U.S. Army War College, Carlisle Barracks is the nation's second-oldest active military base. 

The project at Fort McCoy, Wisconsin, is in year six of the performance period and has exceeded the guaranteed savings amount by $325,100. Fort McCoy is a 60,000-acre Army Reserve installation and home to the 88th Regional Support Command, a Total Force training center responsible for enhancing readiness for more than 100,000 military personnel annually.

Hannah Niedergeses, Energy Division Project Manager, said energy conservation measures for these projects include lighting upgrades, energy monitoring and control system upgrades, which will optimize the operation of HVAC systems throughout the buildings. 

“There are other organizations that award ESPCs, but the thing that makes Huntsville Center stand out from the others is that we have a centralized project management ‘one-stop-shop,’” Niedergeses said.

“The long-term partnership between the Huntsville Center’s Energy Division, the garrisons, energy savings contractors and other Army stakeholders requires a high degree of commitment and work in good faith to enable successful outcomes.”

Niedergeses said the advantages of implementing ESPC projects through Huntsville Center include the program’s experience with ESPC project execution. She said the programs centralized project management enables a standardized and streamlined process by a dedicated and experienced project development team.

“We provide comprehensive program support including engineering technical expertise, project management expertise, cost analysis, legal review, and measurement and verification services through a third-party,” Niedergeses said.

“We also ensure compliance with all Department of Defense policies and regulations of third-party financing.”

Huntsville Center ESPC program support provides a tremendous value, said Richard McCoy, Carlisle Barracks energy manager.

“Since the inception of our (ESPC) contract six years ago, the contractor has been monitoring our energy usage and HVAC operations in five buildings. This has resulted in reduced energy costs each year and assists the garrison in keeping our HVAC equipment running efficiently.”

The U.S. Army Engineering and Support Center, Huntsville has signed off on a $67 million Energy Resilience & Conservation Investment Program (ERCIP) contract to provide Rock Island Arsenal (RIA) with secure, self-sufficient energy.

Foundry workers with Rock Island Arsenal – Joint Manufacturing and Technology Center conduct a foundry pour into sand molds April 16 at Rock Island Arsenal, Ill. Huntsville has signed off on a $67 million Energy Resilience & Conservation Investment Program (ERCIP) contract to provide Rock Island Arsenal (RIA) with secure, self-sufficient energy. (Photo by Debralee Best)
Foundry workers with Rock Island Arsenal – Joint Manufacturing and Technology Center conduct a foundry pour into sand molds April 16 at Rock Island Arsenal, Ill. Huntsville has signed off on a $67 million Energy Resilience & Conservation Investment Program (ERCIP) contract to provide Rock Island Arsenal (RIA) with secure, self-sufficient energy. (Photo by Debralee Best)

A subsection of the Defense-Wide Military Construction (MILCON) program, ERCIP specifically funds projects that save energy and water, reduce Department of Defense energy costs, improve energy resilience and security, and contribute to mission assurance.

Huntsville Center Energy Division’s ERCIP is the Army’s requirement development experts providing planning and technical support to the Army by validating all ERCIP projects before they are submitted to the Department of Defense to compete for funding.

“To fulfill the Army’s energy resilience requirements, Rock Island Arsenal must submit a project proposal to the Office of the Secretary of Defense to compete for funding,” said Richard Moore, ERCIP project manager.

“It’s the job of Huntsville Center’s ERCIP validation team to lend technical support and planning guidance by validating the project.”

Rock Island Arsenal Rock Island Arsenal is a major Army installation employing more than 6,000 military, civilian and contractor personnel and is home to more than 80 tenant organizations providing critical products and services to all of U.S. armed services.

This project supports Rock Island’s resilience to the effects of climate change by securing self-sufficient generation using a diverse set of assets including solar, hydro-electric and battery storage, alleviating reliance on its onsite fuel storage or the serving utility during manmade and natural emergencies.

The contract calls for a planned construct of a microgrid powered by approximately 14 MW natural gas (NG) generators, up to 3 MW solar photovoltaic array, and a 400 kW / 1.6 MWh battery energy storage system integrated with the existing 2.8 MW hydro-electric power plant totaling approximately 20 MW.

“The microgrid system will supply sufficient electricity for continued operation of all critical loads across Rock Island Arsenal during a grid outage for weeks and it will double the renewable energy capacity to almost 50% of critical load,” Moore said.

Absent of the microgrid solution, an extended outage at Rock Island Arsenal could disrupting manufacturing processes and operations vital to U.S. military efforts.

“We validated the project definition, technical feasibility, appropriate technology, estimated energy savings, and associated Life Cycle Cost Analysis by calculating the Savings to Investment Ratio (SIR) and payback years through a comprehensive process,” Moore said.

Huntsville Center’s Energy Division provides cost savings to customers through an array of services including: critical energy analysis; planning and consultation; project management; acquisition support/tools; alternative financing and other services.

Doug Van Werden, RIA Energy Manager, said the ERCIP project will allow RIA to operate during an electrical outage for as long as needed with no impact to the installation mission.  

“Currently the post can only provide about 10-15% of the emergency power required,” he said.  “In the end, this project will allow RIA to continue supporting the war fighter world-wide during power outages while decreasing the post’s daily greenhouse gas production.  A win-win for the post the and the U.S. military world-wide.”

America's Engineers: The People, Programs, and Projects of the U.S. Army Corps of Engineers ® is published by American Conference & Event Media, LLC.

Reproduction in whole or in part without written permission is prohibited.

American Conference & Event Media, LLC., and the U.S. Army Corps of Engineers (USACE) do not assume and hereby disclaim any liability to any person or company for any loss or damage caused by errors or omissions in the material herein, regardless of whether such errors result from negligence, accident, or any other cause whatsoever. The views and opinions in the articles or advertisement are to be taken as the official expression of the publisher, staff, or writers, unless so stated. Neither the publisher nor USACE warrant, either expressly or by implication, the factual accuracy of the articles or advertisements herein, nor so they so warrant any view or opinions offered by the authors of said articles.

Permission to use various images and text in the publication and on this website was obtained from USACE or U.S. Department of Defense (DOD) and its agencies, and in no was is used to imply an endorsement by USACE nor any DOD entity for any claims or representations therein. None of the advertising contained herein implies USACE or DOD endorsement of any private entity or enterprise. This is not a U.S. government publication or website.
© 2023 American Conference and Event Media, LLC.
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram