Military Construction & Joint Readiness: USACE Los Angeles District Supports F-35 Facilities and Infrastructure at Luke AFB

At A Glance

  • High-Level Leadership Engagement: USACE Commander Lt. Gen. William “Butch” Graham Jr. met with 56th Fighter Wing Commander Col. Nicholas “Matrix” Ihde to review joint military construction supporting Air Force readiness.
  • Investment Volume: USACE Los Angeles District manages over $55 million in active construction projects at Luke AFB and the Barry M. Goldwater Range, with an additional $100 million under planning and design.
  • Advanced F-35 Pilot & Maintenance Infrastructure: Delivers state-of-the-art, energy-efficient operational spaces for F-35 Lightning II maintainers, pre-flight operations, and pilot mission debriefing suites.
  • Airfield & Base Infrastructure Upgrades: Current and planned scope includes a new air traffic control tower, aircraft maintenance hangars, runway additions, and dorm renovations.
  • Quality of Life Investments: Constructing a new Child Development Center to expand daycare capacity for military families stationed at the installation.

Editor’s Note: The following is from USACE Los Angeles District, curated by America’s Engineers for general public, commercial contractor, and industry visibility. The original article can be found at the U.S. Army Corps of Engineers news repository.

U.S. Army Corps of Engineers Commander Lt. Gen. William “Butch” Graham Jr. met with 56th Fighter Wing Commander Col. Nicholas “Matrix” Ihde and his senior staff Aug. 25 while reviewing the Army’s military construction projects supporting Air Force readiness at Luke Air Force Base.

Members of the USACE Los Angeles District joined the team from Luke’s 56th Civil Engineer Squadron, or CES, discuss current and future critical facility construction projects, including F-35 Lightning II strike fighter facilities, as some of the work nears completion.

 

 

 

An Army officer in operational camouflage handshakes an Air Force pilot in a flight suit outside a base facility.
U.S. Army Corps of Engineers Commander Lt. Gen. William “Butch” Graham Jr. and 56th Fighter Wing Commander Col. Nicholas “Matrix” Ihde meet to discuss current and future critical facility construction projects Aug. 25 at Luke Air Force Base, Arizona. USACE is the premiere engineering organization in military construction. (Photo by Robert DeDeaux, USACE Los Angeles District Public Affairs)

“At Luke, teamwork drives our mission success,” said Elvis Garay, the deputy area engineer for USACE at Luke. “We understand the 56th CES mission and, through partnership, we deliver the future of fighter pilot training as a team.”

The Los Angeles District supports joint military readiness and advanced warfighter capabilities while improving the quality of life for servicemembers and their families on several installations in the Southwest.

“The projects we deliver each year directly drive warfighter readiness at Luke Air Force Base,” said Garay, a California State University graduate with 20 years of engineering expertise with USACE. “By constructing, modernizing and maintaining specialized training infrastructure, our USACE team ensures that the base has the cutting-edge facilities needed to train combat-ready fighter pilots.”

Exterior perspective of a newly constructed, large steel aircraft hangar with delivery trucks parked on the concrete apron.
Pictured is an Air Force hangar nearing completion Aug. 25 at Luke Air Force Base, Arizona, which is one of many facilities the Los Angeles District is constructing in support of warfighters stationed in the Southwest. (Photo by Robert DeDeaux, USACE Los Angeles District Public Affairs)

According to the district’s Arizona resident engineer, Richard Fontanilla, the F-35 facilities we have built for them are state of the art, robust, and energy efficient. Our belief is that the F-35 maintainers now have the latest and most modern workspace to perform sensitive service to their jets while the pilots have the necessary room for pre-flight, operations, and mission debriefs.

U.S. Air Force Major DeLong of the 56th Civil Engineer Squadron speaks during an indoor briefing with USACE leadership.
U.S. Air Force Lt. Col. Branden DeLong, Civil Engineer Squadron commander, welcomes attendees to a joint Army and Air Force engineering and construction meeting Aug. 25 at Luke Air Force Base, Arizona. (Photo by Robert DeDeaux, USACE Los Angeles District Public Affairs)

“We are providing incredible value to Luke AFB by being the preferred provider of design and construction services.” said Fontanilla, a 28-year engineering veteran. “As we are resourced with project funds, we do not burden Luke AFB with regular overhead, payroll expenses and personnel matters. When we complete a project, we are off to the next mission unless our Luke AFB stakeholders want us to execute more projects, which has been the case continuously for many decades.”

USACE leaders and engineers wearing hard hats inspect the high-bay interior of a newly built aircraft hangar while reviewing blueprints.
U.S. Army Corps of Engineers Commander Lt. Gen. William “Butch” Graham Jr., left, reviews construction progress of an Air Force hangar Aug. 25 at Luke Air Force Base, Arizona. The Los Angeles District began construction of the base hangar in collaboration with the 56th Civil Engineer Squadron. (Photo by Robert DeDeaux, USACE Los Angeles District Public Affairs)

Active USACE military construction projects at the air base exceed $55 million, with an additional $100 million in projects under planning and design. This includes construction on the installation and on the base’s training area at the Barry M. Goldwater Range in southern Arizona.

We’re so glad you are here! Like what you’re reading? Make America’s Engineers a Google preferred news source.

“We are providing value to Luke AFB by constructing the infrastructure to house (service members), shelter and repair aircraft, and maintain facilities that all serve to defend our nation and our interests” said Claudia Garcia, Los Angeles District project manager. “The alignment of our technical expertise with Luke AFB’s values is what has produced the value stream of repeat service to Luke AFB over the years. This is a value stream that we plan to continue providing in the future.”

USACE Commander Lt. Gen. Scott A. Graham and military personnel converse in an open paved courtyard during a project site visit.
U.S. Army Corps of Engineers Commander Lt. Gen. William “Butch” Graham Jr. meets with Luke Air Force Base commanders to discusses current and future critical facility construction projects Aug. 25 at Luke Air Force Base, Arizona. USACE is the premiere engineering organization in military construction. (Photo by Robert DeDeaux, USACE Los Angeles District Public Affairs)

According to Garcia, the district’s Air Force projects also include an air traffic control tower, new aircraft facilities and runway additions. In addition to many readiness facilities, the district is also making quality-of-life improvements through dorm renovations and a Child Development Center.

“This planned child development center will provide sufficient space to meet the demands for daycare services by the installation’s military personnel,” Garcia said.

For more information on U.S. Army Corps of Engineers’ Military Programs, visit: https://www.usace.army.mil/Who-We-Are/Military-Programs/

This article was originally published by the U.S. Army Corps of Engineers under the title, “Army, Air Force collaboration support warfighters at Luke Air Force.” Reposted with permission.

Please Support Independent Publishing We rely on advertising to deliver free magazines, newsletters, and stories at no cost to you. Please consider whitelisting our site or disabling your ad blocker to support our work. Thank you!